MINING SENTRY

Silica Inspection S-069-I-001

weekly17 Questions

Form Preview

This is an interactive preview of the inspection form. In the actual Mining Sentry app, field operators can complete these forms on mobile devices with offline support.

Silica Inspection S-069-I-001

Inspection Type:General Inspection
Cadence:weekly

1. Safety Training – Is there a competent person associated with the task being performed? (QID 1.6.5)*

Photo Required

2. Safety Training – Have the team members been trained on the Work Instruction for the task? (QID 1.6.6)*

Photo Required

3. Safety Training – Are the control measures working properly in accordance with the applicable Work Instruction and the manufacturer’s instructions? (QID 1.6.23)*

Photo Required

4. Inspection Completed – The standard cabin filtration system is properly functioning? (QID 8.2.11)*

Photo Required

5. Operators Expectations – Are enclosed cabs free (as practicable) from settled dust? (QID 8.6.15)*

Photo Required

6. Operators Expectations – Are doors and windows closed during operation? (QID 8.6.16)*

Photo Required

7. Free of Damage/Properly Maintained – Are the control measures working properly in accordance? (Self-cleaning HEPA vacuum and shroud, wet methods, are implemented and used as prescribed in the applicable Work Instruction(s).) (QID 12.1.10)*

Photo Required

8. Free of Damage/Properly Maintained – Are all of the tools being used and maintained appropriately? (QID 12.1.11)*

Photo Required

9. Respirator – Is the appropriate level of respiratory protection per the Work Instruction being worn? (QID 16.8.11)*

Photo Required

10. Respirator – Have the team members been medically cleared and fit tested within the last year? (QID 16.8.12)*

Photo Required

11. Respirator – If required to wear a respirator greater than 30 days per year; are the team members enrolled in the company’s medical surveillance program? (QID 16.8.15)*

Photo Required

12. Signs/Barricades – Has the required boundary been established and maintained throughout the duration of work? (QID 19.1.8)*

Photo Required

13. Foreman*

14. Supervisor*

15. Project Manager*

16. Area Manager*

17. Additional Comments*

Photo Required

Note: This is a preview of the inspection form. In the actual Mining Sentry application, operators can complete these forms on mobile devices, attach photos, and submit them for real-time tracking.

Features

  • Mobile & offline capable
  • Photo & video attachments
  • Real-time notifications
  • Customizable workflows
  • Compliance tracking

Ready to use this template?

Start using this and other templates in your mining operation today.

Book a Demo